top of page
redsq4Asset 28.png

Extending Equipment Lifetime and Improving Processes Through Maintenance

The goal of Weidner Plant Services is simple; help Plant Maintenance reach their goals through our large workforce and expert technicians.

View our Line card

mixproof1Asset 9.png
WPSGRADEAsset 5@2x.png
servicelogoAsset 17.png
WCR_Logo-FEID20.jpg

For All Your Heat Exchanger Needs, Turn to WCR

At WCR, our success comes from focusing on our clients’ unique needs, helping them optimize the performance of their processes time and time again. Join some of the leading companies in the world in making WCR your single source for new and replacement heat exchanger plates and gaskets. We strive to have the right parts you need in stock and ready to ship to you in a matter of days. That’s the WCR Difference!

WCR has teamed up with Weidner to continue the Gold Standard.

sanitary_plate_heat_exchanger_s37_stainl

Read more about our GEA service partnership below:

Leading edge

GEA VALVE AND PUMP SERVICE

servicelogoAsset 17.png
eco1Asset 35.png
Anchor 1

Benefits to Reach your Goal

control image.jpg

A Valve Service Summary

1

valve 1Asset 36.png

Remove Valves from Line

Our expert technicians and our one of a kind process allows us to service numerous rooms and clusters during a single shutdown. We label and remove all of our target valves.

Up to 1200 in a single weekend. 

Inspect and collect data

When we service valves we offer more than the immediate fix. We collect usable data. Through our cmms, we record passed and failed seal states. With our data we can then create a report detailing your Plant fail rate and problem areas. We help reactive maintenance become predictive.

DATA 1Asset 37.png

2

3

valve 2Asset 38.png

Replace Seals and Lubricate

After we pass or fail a seal, we replace all wearable parts on your valves. Regular maintenance lengthens equipment lifetime. Based on inspected data, we can create a pm program and catch problems before they happen. We provide all the parts and spares.

5

valve 4Asset 39.png

Remove Wearable Seals and Clean Valve

After Data collection, we remove all wearable parts from the valve. The valve is then sent to be sanitized, removing any product debris or bacteria build-up from pitted seals. Regardless of seal state, product build up  can occur in certain processes.

valve 3Asset 40.png

4

Reinstall Valves and Start-up Test

Our job isn't done when the equipment is serviced. We make sure start-up goes smoothly, and there are no leaks or automation issues with any replaced valves. 

rrAsset 18.png
Anchor 2
red cut 13Asset 5.png

Reduce Contamination and Recall Risk

Harmful bacteria or unexpected contaminates arise when wearable rubber parts become pitted or compromised to allow product or cleaning residue to harbor within the seal. Bacteria festers and grows if allowed to reside on equipment. 

Deteriorating seals prevent complete sealing and line isolation. This allows cross-contamination from line substances leaking or open air access. We see an average of 71% fail rate on seals for a first time PM

 

in 2019 2.1 billion USD was lost to food recalls, not accounting for brand and consumer confidence damage.

A preventative maintenance presence reduces recall risk

How we help you mitigate recall risk

  • Replace pitted, inking, or failing seals harboring bacteria.

  • New seals create total line and air isolation to prevent cross-contamination.

  • Inspecting and cleaning valves on a regular basis removes product debris from equipment surfaces 

  • Preventative Maintenance allows for regular data collection to catch possible contamination warnings. 

increase4Asset 19.png
Anchor 5

Improve Process Efficiency

Inefficient Plants waste time, money, energy and product. Our valve and pump service can reduce inefficiency in your product lines. 

Deteriorating seals prevent complete sealing and line isolation. This allows leaking which wastes product and power per product output. Additionally any  cross-contamination causes massive inefficiency in unused production and reactive shutdown. 

Downtime can cost up to $5,600 per minute. Planned down time can reduce reactive maintenance and can be used to length equipment lifetime and improve performance.

Equipment maintenance improves performance 

How we help create a more efficient process

  • Replace pitted, inking, or failing seals causing line inefficiency.

  • New seals create total line and air isolation to prevent leaking.

  • Inspecting and cleaning valves on a regular basis catches untimely reactive maintenance.

  • Remove product and time loss due to contamination.

prevent3Asset 16.png
Anchor 4

Reduce Emissions and Waste

Creating a sustainable process matters at every level. Automation can save equipment by enrolling in a Preventative Maintenance program. Replacing wearable seals saves metal equipment. On average 1.9 tons or carbon emissions are produced per every ton of steel manufactured, by servicing and extending this equipment, carbon emissions are being avoided 

Necessary food production creates a quarter of the world's emissions. Removing line efficiency, such as leaks and recalls means more product for less energy. 

A preventative maintenance program saves product, equipment, and energy.

How we help boost sustainability in your process

  • Replace pitted, inking, or failing seals causing energy inefficiency.

  • New seals create total line and air isolation to prevent waste.

  • Inspecting and cleaning valves on a regular basis prevents new machine production and additional emissions.

  • Remove product and time loss due to contamination.

eco1Asset 35.png
Anchor 3
redsq4Asset 28.png

Lengthen Equipment Lifetime

Deteriorating seals creates metal to metal contact resulting in equipment damage. 

Automation valves suffering from wearable part damage can cease to work, forcing reactive maintenance. 

Damaged equipment needs budget and time for replacement. 

On average  first time PM customers see a 71% wearable part failure. 9% percent of these have already cause equipment damage, more than the inefficiency in product and energy.

an ounce of prevention is worth a pound of cure

How we help extend your equipment lifetime.

  • Replace failing seals allowing metal to metal contact.

  • Add lubrication the valve to run smoothly.

  • Inspecting and cleaning valves on a regular basis catches untimely reactive maintenance.

  • Empowering data to keep you ahead of the curve in production and maintenance. 

lelAsset 14.png
WPSGRADEAsset 5@2x.png

PHONE: 801-664-5006

EMAIL: sales@weidnerpro.com

Get a quote or reach out to us:

bottom of page